Pre-Concrete Surface Cleaning in Tunnels
The first stage of tunnel construction, called temporary support, involves excavation, removal of debris, installation of bolts, and contact injections. After these operations, tests of the constructions are carried out and then the second stage, called permanent support, is initiated.